Milan Data Center Campus

Data Center Excellence in the Design World’s Leading City

MILAN CAMPUS OVERVIEW

Our Northern Italian data center campus will be located on more than 17 acres (7 hectares) in Milan. Once fully developed, the 750,000 sq. ft. (70,000 sq. m.) campus will offer 32MW of critical IT load. The first phase, scheduled for delivery in 2021, will include 8MW of IT capacity.

  • 17-acre (7 hectares) campus
  • 32MW of critical IT load in one, two-story facility
  • 113,000 sq. ft. (10,500 sq. m.) of leasable data center space
  • 300W/sq. ft. (3.2kW/sq. m.) average density
  • Class A building amenities including office, conference rooms, break rooms and more

GET THE DATA SHEET GET MORE INFO

Our commitment to offering a superior customer environment is unsurpassed. Providing an atmosphere within each data center that helps you and your personnel relax, recharge and work more efficiently is essential. Our Milan campus will include dedicated customer office space, always-available conference rooms and large-scale break rooms.

  • Dedicated offices and workspaces customizable to your needs
  • Multiple conference rooms and meeting spaces throughout the campus
  • Secure storage with easy access between data modules
  • EV charging stations for cars and bikes
  • Easy access to the Malpensa International Airport
GET CAMPUS UPDATES

Vantage’s new Milan campus will provide N+1 redundancy across all systems. An on-campus substation and state-of-the-art electrical equipment are the foundation for maximum efficiency and reliability, ultimately ensuring customer uptime and reliability thanks to the support from a world-class in-house operations team.

  • Substation (N+1) on campus at 120KV
  • Power provided by Enel and Terna, the leading energy providers in the region
  • Multiple, diverse power feeds supporting the campus
  • 480V electrical configuration
  • All systems 100% concurrently maintainable
GET CAMPUS UPDATES

Vantage’s Milan campus will use a highly efficient closed-loop chilled water system generated through air-cooled chillers. An integrated economizer capability will allow reduced compressor energy based on outside ambient temperature–when weather is favorable, cooling becomes more sustainable and less resource intensive.

  • N+1 overall, N+2 component-level redundancy across mechanical systems
  • Computer Room Air Handling (CRAH) units located in two galleries on opposite sides of each data module allow for highly efficient airflow distribution
  • Closed-loop chilled water system with air-side economizers
  • Water Utilization Efficiency (WUE) is near zero (liters/kW/hr) using the latest cooling design
GET CAMPUS UPDATES

Fiber pathways into the Vantage Milan campus are multiple and diverse, with access to both dark and lit fiber. The campus is carrier neutral, giving customers the flexibility to manage their own network.

  • Two meet-me-rooms (MMRs) allow for diverse paths and multiple connectivity options
  • Three points-of-entry (POEs) for the campus, ensuring maximum path diversity for inbound carriers
GET CAMPUS UPDATES

Stringent security and safety measures are hallmarks of every Vantage campus. Our Milan data center campus is no exception, so you can rest easy when it comes to the security of your data.

  • On-site security operations center with patrols 24x7x365
  • K12-rated fencing around the perimeter, with impact protection
  • CCTV on all access control points throughout the entire campus
  • Dual authentication for customer and critical infrastructure areas
  • Visitor Management System with controlled and monitored access points and stringent access control policy